Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and operation of the car



Toyota Land Cruiser
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Cooling systems, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
- 7. Transmission
   + 7.1. Mechanical transmission
   + 7.2. Automatic transmission
   + 7.3. Transfer case
   - 7.4. Coupling, driveshafts, half shafts and leading bridges
      7.4.1. Technical characteristics
      + 7.4.2. Coupling
      + 7.4.3. Cardan shaft, reducer and axes
      7.4.4. Forward half shaft and epiploon
      - 7.4.5. Back (forward) bridge
         7.4.5.1. Reducer epiploon
         7.4.5.2. Half shaft, bearing and epiploon (semi-unloading half shafts)
         7.4.5.3. A half shaft and an epiploon (completely unloaded half shafts)
         7.4.5.4. A nave of a back wheel (completely unloaded half shafts)
+ 8. Brake system
+ 9. Suspension brackets and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electrical circuitries




eeac64fe


7.4.5.2. Half shaft, bearing and epiploon (semi-unloading half shafts)

GENERAL INFORMATION

Details of the back bridge with the semi-unloaded half shaft

1. Clip of a cable of the emergency brake
2. Cable
3. Reducer cover
4. Laying
5. Bearing
6. Epiploon
7. Drum
8. Laying
9. Maslootrazhatel
10. Half shaft
11. Lock plate
12. Roller of satellites
13. Dividing plug
14. Pin

Half shafts are removed for replacement of the bearing, an epiploon or removal of a reducer of the bridge.

Removal and installation

PERFORMANCE ORDER
1. Lift a back part of the car.
2. Remove wheels, disconnect a cable of the emergency brake and remove drums.
3. Merge oil from a reducer.
4. Remove a back cover of a reducer.
5. Rotating reducer gear wheels, install the roller in available situation.
6. Turn off a bolt, get the roller and the dividing plug.
7. Ask the assistant to press a half shaft and get a lock plate from a half shaft flute.
8. Get a half shaft, holding a canopy.
9. Check a condition of the bearing and an epiploon.
10. If it is necessary to replace them, then remove the bearing together with an epiploon a shock stripper with a two-maxillary nozzle.
11. Before installation of a half shaft slightly grease epiploon edges with jellied lubricant.
12. Assembly is carried out upside-down.
13. Delay all fastenings with the set moment.
14. Fill in oil in a reducer.