Toyota Land Cruiser + 1. Maintenance instruction + 2. Maintenance + 3. Engines + 4. Cooling systems, heating + 5. Fuel and exhaust systems + 6. System of decrease in toxicity + 7. Transmission + 8. Brake system + 9. Suspension brackets and steering - 10. Body 10.1. Maintenance and repair 10.2. Vinyl finishing 10.3. Upholstery and rugs 10.4. Repair of insignificant damages 10.5. Repair of considerable damages 10.6. Loops and locks 10.7. Windshield and motionless glasses 10.8. Cowl 10.9. Latch of a cowl and cable of the drive 10:10. Forward lattice 10:11. Forward wing 10:12. Internal panel of a door 10:13. Door lock, switch of the lock and handle 10:14. Door glass 10:15. Window regulator 10:16. Side mirrors 10:17. Door 10:18. Door of a back compartment 10:19. Back cover (top door of a back compartment) 10:20. Casing of a steering column 10:21. Panels of forward facing of salon 10:22. Average floor section 10:23. Forward facing panel of salon 10:24. Seats 10:25. Bumpers + 11. Electric equipment + 12. Electrical circuitries
|
Prevention
Works are performed together.
Removal and installation
PERFORMANCE ORDER |
1. Lift glass. Disconnect the battery from weight. |
2. Open a door and establish wooden props under a door, having covered them with rags. |
3. Remove the internal panel of a door and the water filter. |
4. Disconnect all sockets of conducting, a wire on the weight and latches, the fixing conducting plaits. Previously designate all sockets and wires. |
5. Disconnect a rubber casing from a door. Then stretch conducting through an opening in a casing, having removed with that of a door. |
|
6. Carefully beat out an axis of the limiter of opening of a door in the direction specified by an arrow. |
7. Outline contours of door loops. |
|
8. Holding a door, turn off bolts of loops using a special key for an otvorachivaniye of bolts of door loops and remove a door. |
9. Installation is carried out upside-down. |
|
Adjustment
Adjustment of provision of a clamp of the lock
|
For adjustment lower screws and move a lock clamp in the necessary direction. |
PERFORMANCE ORDER |
1. Before adjustment check existence of a side play in axes of door loops. Completely open a door and shake a door up-down, without shaking at the same time a body. If the side play of loops exceeds 1,6 mm, then loops should be replaced. |
2. Adjustment of a door concerning a body is reached by movement of a door at the released bolts of fastening of loops to a body or to a door. Doors are considered adjusted if the top edge of a door is parallel to a body roof edge, the surface of a forward door settles down aflush with a wing, a surface of a back door – aflush with a back wing, and the lower edges of doors coincide with a powder profile. If adjustment of doors is not reached by movement in loops, then between loops and a body (door) it is necessary to lay remote laying (are available on sale). |
3. Remove the internal panel of a door and the water filter. |
4. For adjustment of provision of the closed door outline a contour of a clamp and be convinced that the latch of the lock makes contact with the central part of a clamp. Otherwise adjust, moving a clamp up-down. |
5. For adjustment of a clamp be convinced of the side direction that the door is aflush with the next panels of a body (a forward or back wing). Otherwise move a clamp in the horizontal direction so that the door was aflush with the next panels of a body and was freely locked. |
|
|
|