Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and operation of the car



Toyota Land Cruiser
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Cooling systems, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and steering
+ 10. Body
- 11. Electric equipment
   11.1. Search of malfunctions
   11.2. Safety locks
   11.3. Fusible crossing points
   11.4. Breakers
   11.5. Relay
   11.6. Breaker of indexes of turn / alarm system
   11.7. A combination of switches on a steering column
   11.8. Lock of ignition and drum of the lock
   11.9. Indexes of level of fuel, pressure and temperature of oil
   11:10. Guard of devices
   11:11. Screen wiper electric motor
   11:12. Receiver and loudspeakers
   11:13. Antenna
   11:14. Heater of back glass
   11:15. Headlights
   11:16. Case of a halogen headlight
   11:17. Sound signal
   11:18. Replacement of lamps
   11:19. Side mirrors with the electric drive
   11:20. System cruise control
   11:21. Window regulator electric drive
   11:22. Electric drive of door locks
   11:23. Safety cushions
+ 12. Electrical circuitries




eeac64fe


11:14. Heater of back glass

GENERAL INFORMATION

The heater consists from thin a provolok, baked with the surface of glass.

Small destructions a provolok can be repaired independently.

Check

PERFORMANCE ORDER
1. Include ignition and a heater.
2. Dress the put strip of aluminum foil on the voltmeter probe and press down a finger to heater thread.
3. If tension is equal in the center of thread to 6 V, thread is serviceable if tension is equal to 12 V, thread is torn off (the break takes place between the center of thread and weight). If voltage of 0 V, then thread it is torn off between the center and the feeding heater conclusion.
4. If threads are serviceable, then connect (-) a heater conclusion to weight. If indications of the voltmeter change, then connection with weight unsatisfactory.
5. The place of break of thread can be established conducting aluminum contact on the voltmeter probe on thread aside from (+) a conclusion to (-) conclusion of a heater. (-) connect a conclusion of the voltmeter to aluminum contact. In the place of break the indication of the voltmeter has to increase from 0 up to several volts.

Repair

PERFORMANCE ORDER
1. It is possible to splice the torn-off heater thread by means of the carrying-out epoxy structure of Dupont N 4817 or equivalent.
2. Disconnect a heater and wait for full cooling.
3. A steel sponge carefully to a raspoliruyta also wipe the damaged site with alcohol.
4. Impose on the damaged site a mask from an adhesive tape.
5. Prepare pitch, being guided by the instruction.
6. Apply structure on a crack in a mask, smearing approximately on 18 mm in both parties.
7. 24 hours later unmask.