Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and operation of the car



Toyota Land Cruiser
+ 1. Maintenance instruction
+ 2. Maintenance
+ 3. Engines
+ 4. Cooling systems, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
- 9. Suspension brackets and steering
   9.1. Technical characteristics
   9.2. Stabilizer of a forward suspension bracket and plugs
   9.3. Forward and back shock-absorbers
   9.4. Springs and plugs
   9.5. Springs of suspension brackets (FJ80 car)
   9.6. Cross bar (FJ80 car)
   9.7. Levers of a suspension bracket (FJ80 car)
   9.8. Rotary fist
   9.9. Steering wheel
   9.10. Steering drafts
   9.11. Reducer
   9.12. Pump of the hydraulic booster
   9.13. Removal of air from the power steering
   9.14. Wheels and tires
   9.15. Angles of installation of forward wheels
+ 10. Body
+ 11. Electric equipment
+ 12. Electrical circuitries




eeac64fe


9.5. Springs of suspension brackets (FJ80 car)

FORWARD SUSPENSION BRACKET

Removal

PERFORMANCE ORDER

Prevention

Removal of springs requires the device for their compression.


1. Lift a front of the car and remove forward wheels.
2. Establish supports under a bridge beam.
3. Disconnect from a beam of the bridge of draft of the stabilizer and shock-absorbers.
4. Carefully lower the bridge so that springs completely stretched.
5. Squeeze springs adaptation.
6. Remove springs.

Installation

PERFORMANCE ORDER
1. Check a condition of springs, at detection of cracks or in case of corrosion of a spring replace.
2. Squeeze a spring and establish in the place, having tracked correctness of installation of a spring (A) in the lower cup (In).
3. Further installation is carried out upside-down.

BACK SPRINGS

Removal

PERFORMANCE ORDER
1. Lift a back part of the car and remove wheels.
2. Establish supports under a bridge beam.
3. Disconnect arms of the stabilizer and shock-absorbers from a bridge beam.
4. Turn off a bolt of a cross bar and take a bar aside.
5. Carefully lower the bridge so that springs completely stretched. Remove a spring, having undertaken the lower termination.
6. Check a condition of springs, at detection of cracks or in case of corrosion of a spring replace.

Installation

PERFORMANCE ORDER
1. Installation of back springs is carried out upside-down.
2. Delay all fastenings with the set moment.
3. Track correctness of installation of springs. The lower termination of a spring has to rest against the cup limiter.