Toyota Land Cruiser

FJ60, FJ62 and FJ80 1980-1997 of release

Repair and operation of the car



Toyota Land Cruiser
+ 1. Maintenance instruction
+ 2. Maintenance
- 3. Engines
   + 3.1. Engines 2F and 3F-E
   - 3.2. Verkhneklapanny engine 1FZ-FE
      3.2.1. Technical characteristics
      3.2.2. Types of repair without dismantle of the engine
      3.2.3. Cover of a head of cylinders
      3.2.4. The soaking-up collector
      3.2.5. Final collector
      3.2.6. Cam-shafts and pushers
      3.2.7. Head of cylinders
      3.2.8. Cover of the chain drive of cam-shafts
      3.2.9. Forward epiploon of the crankshaft
      3.2.10. Oil pallet
      3.2.11. Oil pump
      3.2.12. Flywheel (drive plate of the hydrotransformer)
      3.2.13. Back epiploon of the crankshaft
      3.2.14. Details of a suspension bracket and engine
   + 3.3. Dismantle and capital repairs of the engine
   + 3.4. Engine electric equipment
+ 4. Cooling systems, heating
+ 5. Fuel and exhaust systems
+ 6. System of decrease in toxicity
+ 7. Transmission
+ 8. Brake system
+ 9. Suspension brackets and steering
+ 10. Body
+ 11. Electric equipment
+ 12. Electrical circuitries




eeac64fe автоматика пкф


3.2.5. Final collector

GENERAL INFORMATION

Prevention

Works are performed on the cold engine.


Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. On the engines equipped with PAIR system (pulse system of injection of fuel) remove system of the tubes and valves close to a collector.
3. Remove thermal screens (bolts of the thermal screen of a final collector are specified by shooters).
4. Moisten nuts and bolts of a final collector and a nut of fastening of an exhaust pipe to a collector with the getting liquid. After wetting turn off nuts of an exhaust pipe.
5. Turn off nuts (are specified stsrelkami) and remove a collector and laying.

Installation

PERFORMANCE ORDER
1. Clear the demountable planes of a collector and a head of cylinders of the remains of material of laying and deposits of a deposit. If leak signs through laying are observed, then check deformation of the demountable plane of a collector in a specialized workshop, if necessary a proshlifuyta.
2. Dress new laying on hairpins of a head of cylinders.
Prevention

Tags on laying have to be turned from a head of cylinders aside.


3. Establish a collector and wrap nuts on former places.
4. Evenly tighten nuts in three-four receptions with the set moment (see subsection 3.2.1). Tighten bolts and nuts from the center to the periphery of a collector.
5. Establish other details as it should be the return to dismantling.
6. Start the engine and check tightness of connections of a final collector.